Distilled water will not be available 8 a.m.-noon tomorrow (Tuesday, June 2) in Butler-Carlton Civil Engineering Hall due to work on the Clayco Advanced Construction and Materials Laboratory (ACML) project. This will only affect distilled water, such as water used in labs.
Read More »To install a new air compressor, compressed air will not be available in the Engineering Research Laboratory 10 a.m.-3 p.m. Wednesday, Aug. 28.
Read More »The sanitary sewer for Butler-Carlton Civil Engineering Hall is being replaced as part of construction of the Clayco Advanced Construction and Materials Library (ACML). The restrooms in Butler-Carlton will be closed 6-7:30 a.m. Wednesday, Aug. 28, and 6-7:30 a.m. Thursday, Aug. 29. During this time, drinking fountains and sinks also will not work in Butler-Carlton.
Read More »The Maximo facilities work order system will be updated 12:30-4:30 p.m. Tuesday, March 19. During this time, there will be intermittent outages and you may not be able to submit or view work orders. For more information or assistance during the outage, please contact the facilities staff at 341-4252.
Read More »Compressed air will not be available in the Interdisciplinary Engineering (IDE) Building and Norwood Hall Tuesday, Nov. 13. This outage will affect labs in the IDE building and handicapped-accessible doors in Norwood Hall.
Read More »A previous message stated in error that the Campus Support Facility will not have air conditioning Wednesday, Aug. 1. Most of the building will have air conditioning, although a small portion will not. The offices that will be affected by the A/C outage are:
There will be no chilled water in McNutt Hall during the week of spring break, March 23-27. The outage will allow for work to be completed on an air handler and valves in the geothermal plant. For more information, call Ron Boggs at 341-7619.
Read More »