Due to construction, access to the pedestrian tunnel is limited this week through Friday, Jan. 12. Pedestrians can access the tunnel through the breezeway of Residential College 1. The image below shows the preferred route. This path does require the use of stairs.
Other options for pedestrian traffic crossing Highway 63 include pedestrian crossings near the roundabout or the mid-block crossing by the Havener Center.
For questions, contact Bradley Clay, senior assistant director of construction services, at 341-4888.